With Automated Logic’s increasing effort to provide great integration solutions we were able to integrate the school’s Steam Boiler Plant that had a complex control system already installed.

Project Scope

Previous to the integration the staff was only able to read critical information at the Boiler Control Panel.

After we installed a graphical overlay and utilized the information we were able to provide our customer with a very intuitive and user friendly Building Automation System (BAS). This BAS allowed the staff to not only view information once reserved for the plant only, it also allowed for scheduling of the boiler system to accommodate snow days, holidays, or warm weather to conserve energy.